Abu Dhabi National Oil Co.’s (ADNOC) majority owned ADNOC Gas PLC has let a contract to Worley Ltd. subsidiary Worley Engineering Pty. Ltd. to deliver front-end engineering and design (FEED) services for the operator’s proposed plan to add natural gas processing capacity as part of its onshore Bab Gas Cap (BGC) project in Abu Dhabi.
Worley’s scope of design under the Dec. 4 FEED contract award covers development of a series of new units for the BGC project that, together, aim to boost ADNOC Gas’ existing systemwide gas processing capacity of about 10.2 bcfd by more than 1.8 bcfd, or 20%, in line with the operator’s plan to achieve an overall gas processing capability of 13.2 bcfd by 2029 to help unlock value of UAE gas resources and support domestic gas self-sufficiency, Worley and ADNOC Gas said separately.
Read more